This job is no longer available
This job expired on 11/11/2026. It no longer accepts applications.
Senior Mine Planning Engineer
MMG Limited · Toteng
Job description
About the role
The Senior Mine Planning Engineer is responsible for delivering short‑term and medium‑term mine schedules, developing Mine Area Designs (MADs) and maintaining a rolling three‑month production plan for an underground operation.
Key responsibilities
- Translate company objectives into detailed MADs, three‑month rolling plans and infrastructure schedules.
- Develop and maintain an integrated production schedule covering development, stoping, service holes, raise bore, diamond drilling and infrastructure.
- Convert the three‑month plan into detailed weekly schedules and sequence activities to optimise production, grade delivery, equipment utilisation and ventilation constraints.
- Ensure compliance with operational schedules for development, slot raises, stope drilling, charging, blasting, mucking and paste backfilling.
- Participate in weekly production meetings, support short‑interval control (SIC) processes and update schedules based on operational feedback.
- Monitor actual performance, analyse deviations in tonnage, development meters, drill‑and‑blast performance and equipment utilisation.
- Produce monthly planning reports with variance analysis, root‑cause identification and corrective actions.
- Develop work‑quality instructions for scheduling activities, train the scheduling team and support business‑improvement initiatives.
Required profile
- Bachelor’s degree in Mining Engineering or a related field.
- Minimum 10 years of underground mining experience, including at least 5 years in mine planning and scheduling.
- Underground Mining Blasting License and registration with the Engineers Registration Board of Botswana.
- Proven experience managing short‑term production schedules and practical drill‑and‑blast knowledge.
- Experience with long‑hole open stoping design is advantageous.
Required skills
- Mine Area Design (MAD) development.
- Three‑month rolling production scheduling.
- Weekly mine scheduling and short‑interval control (SIC).
- Variance analysis and performance reporting.
- Underground blasting and drill‑and‑blast operations.
- Long‑hole open stoping design.
Questions fréquentes
Why are you reporting this job?
A question about this job?
Ask it here: you will get the full job summary by e-mail, right away.
Boost your chances
Upload your CV — we will match you with relevant openings.
Analyzing your CV...
MMG Limited
Toteng